When a reviewer rejects a document (for example a Right to Work upload with no passport), the candidate uploads again from the portal. That re-upload is a new Document Submission with status Pending Review on the same Document Assignment and Document. The old submission is kept.
Without a link between the two, operations teams have to open each pack to spot re-uploads. With thousands of packs that does not scale. The package now links every new submission to the one it replaces and ships a report that lists the re-uploads still waiting for a check.
On insert of a Document Submission, the package sets Previous Submission to the latest existing submission with the same Document Assignment and Document.
| Field | Object | Meaning |
|---|---|---|
b3o__Previous_Submission__c (Previous Submission) |
Document Submission | Lookup to the submission this one replaces. Blank = first submission for that document. Related list label: Resubmissions. |
Rules:
b3o__Onboarding_Trigger_Control__c) is on. That switch only bypasses the requested documents sync.The field is read only for users with the Onboarding Admin Full Permission permission set. Grant read access through your own permission set for reviewers who should see it.
Reports > 3B Onboarding > Resubmissions Awaiting Re-check, built on the Document Submissions report type.
Pending Review. Only re-uploads show, and a row drops off as soon as it is approved or rejected.Packaged reports cannot be edited in the subscriber org. To filter by pack, owner or brand, or to add your own fields, use Save As to clone it into your own folder. The Document Submissions report type exposes these Previous Submission fields:
| Report type field | Use |
|---|---|
| Previous Submission | Link to the replaced submission |
| Previous Submission: Status | Why the candidate re-uploaded (Rejected, Request Update, Approved) |
| Previous Submission: Created Date | When the original was submitted |
| Previous Submission: Rejected Timestamp | When it was rejected |
| Previous Submission: Public Comments | Rejection reason shown to the candidate |
Links are set on submissions created after the upgrade. Re-uploads already waiting in Pending Review before the upgrade have no link, so they do not show in the report. Review those with the standard Document Submissions reports, or populate the field with your own data load: for each submission, the Previous Submission is the latest earlier submission with the same Document Assignment and Document.
If your org already has custom resubmission tracking, review its fields, automation and reports before retiring any duplicate logic.