Clients often want to keep a worker longer: "James worked for us this week, extend him for two more weeks". A placement extension records that request on the placement itself, keeps a history of every extension, and lets the extended period run on different terms, for example a move from production line 1 to production line 2 or a new rate group.
A placement is a Working Pattern (b3s__Working_Pattern__c) for one worker. An extension is a Booking Extension (b3s__Booking_Extension__c), a master-detail child of the placement. Extensions work the same for VMS and non-VMS placements.
A placement is a chain of periods that never overlap:
| Period | Dates | Terms |
|---|---|---|
| Original placement | Start to Original End | The placement's own job, site, pattern, rate group, cost center, PO, reason code |
| Each Approved extension | Extension Start to New End | The extension's own values |
Example: a placement runs 1 to 15 January on Job X, Site Y, Rate Group Z. Extension 1 covers 16 to 31 January on Rate Group Z2. Extension 2 covers 3 to 14 February on Job X2, Site Y2. Shift generation creates three blocks of shifts, each with its own job, site, site timezone and rate group. No shifts are created for 1 and 2 February because they fall in the gap.
On the placement:
| Field | Meaning |
|---|---|
End (End__c) |
The current end, including approved extensions. Expense matching, timesheets, schedules and portals keep reading this field. |
Original End (Original_End__c) |
The end before the first extension. Stamped automatically. |
Extensions (Extension_Count__c) |
Roll-up: number of Approved extensions. |
Last Extension End (Last_Extension_End__c) |
Roll-up: New End of the latest Approved extension. |
| Field | Notes |
|---|---|
Placement (Working_Pattern__c) |
Required. Master-detail: access follows the placement. |
Status (Status__c) |
Pending (default), Approved, Declined, Withdrawn, Canceled. Everything except Pending is final. |
Extension Start (Extension_Start__c) |
Blank = the day after the placement's current End. Must be after the current End. A later start leaves a gap. |
New End (New_End__c) |
Required. Becomes the placement End on approval. |
Previous End (Previous_End__c) |
Stamped: the placement End when the extension was created. |
Booking Request (Booking_Request__c) |
Stamped from the placement. |
| Job, Site, Site Location, Working Pattern Type, Rate Group, Rate Basis, Cost Center, PO Number, Reason Code | The terms of the extension period. Blank on create = copied from the latest period (latest Approved extension, else the placement, else its booking request). Every extension therefore records the terms it was approved at. |
Comments (Comments__c) |
Free text from the requester. |
Awaiting (Awaiting__c) |
Client, Master Vendor or Vendor: the party that must confirm next. Blank once decided, and blank on a Pending request an internal user decides. |
Approval Chain (Approval_Chain__c) |
The parties that must confirm, in order (for example Client;Vendor), fixed when the request was made through a portal or the VMS panel. |
Requested By Role (Requested_By_Role__c) |
Client, Master Vendor, Vendor, or Internal (record page, Extend Placement, Flow, integration). |
Requested By (Account) / (Contact) (Requested_By_Account__c / Requested_By_Contact__c) |
The requesting account and, for portal users, the contact. |
Reviewed By Role / Reviewed Timestamp (Reviewed_By_Role__c / Reviewed_Timestamp__c) |
The last approval step or decision. Internal when an internal user set the Status directly. |
Response Comments (Response_Comments__c) |
One line per approval, decline or withdrawal, prefixed with the party (for example Vendor: worker available). |
Edit_Decided_Extensions (in the WFM Admin permission set) can edit or delete a decided extension; portal users cannot. The override changes the extension record only. The placement and booking End and the generated shifts stay as they are, so correct them by hand.An extension takes effect when its Status becomes Approved:
Ways to request and approve:
| Route | Result |
|---|---|
| Extend Placement action on the placement record page | Creates the extension already Approved: an immediate extension. Leave terms blank to keep the current ones. |
| New on the placement's Booking Extensions related list | Creates a Pending request with no approval chain. An internal user approves it by setting Status to Approved. |
| Flow, Approval Process, integration | Any process that sets Status to Approved applies the extension the same way. |
| Client Shift Manager (request, client approval), Vendor Portal (vendor confirmation), Placement Extensions component (master vendor / internal) | Through the server endpoints below. The approval chain decides who confirms. |
Setting Status directly is the internal override: it works at any point of a chain and stamps Reviewed By Role = Internal.
Confirming for the vendor. When a sub-vendor confirms outside the portal (for example by phone), the master vendor records it on the Placement Extensions component with Approve for vendor / Decline for vendor. Unlike the Status override, this answers only the Vendor step: the chain carries on as if the vendor had answered on the portal, Reviewed By Role = Vendor, and the required note is added to the responses as Vendor: recorded by <user> on behalf of the vendor: <note>. It needs edit access to the placement.
Extensions are the client's request. The client raises them in the Client Shift Manager; the master vendor (or, on a non-VMS placement, an internal user) can raise one on the client's behalf, which skips the client. Vendors never request; they confirm.
When a request comes through the endpoints, the parties that must confirm are fixed on the request, in this order:
Approve_Requisitions__c) confirms first.Account.VMS_Workflow_Mode__c, blank = the Client Shift Manager definition's vmsWorkflowMode), the master vendor confirms.Account.Extension_Requires_Vendor_Confirmation__c, default on) is checked. A worker the master vendor supplied itself has no vendor step.A request raised on the client's behalf only has the Vendor step (when step 3 applies), else it applies at once. The chain is fixed when the request is made: changing an account setting later does not change requests already pending.
| Requested by | Placement | Chain |
|---|---|---|
| Client | VMS, Marketplace, sub-vendor | Vendor |
| Client (profile requires requisition approval) | VMS, Marketplace, sub-vendor | Client, Vendor |
| Client | VMS, MSP, sub-vendor | Master Vendor, Vendor |
| Client, vendor confirmation off | VMS, Marketplace, sub-vendor | Master Vendor |
| Client | VMS, master vendor's own worker | Master Vendor |
| Client | Non-VMS | Internal |
| Client (profile requires requisition approval) | Non-VMS | Client, Internal |
| Master Vendor | VMS, sub-vendor | Vendor |
| Master Vendor, vendor confirmation off | VMS | none: approved at once |
| Internal user (VMS panel, record page, Flow) | Non-VMS or any | none |
Each approval moves Awaiting to the next party. The last approval sets Status to Approved, which applies the extension (see above). A decline sets Declined. The requester can withdraw while Pending. An empty chain creates the extension Approved straight away. A record created without the endpoints (record page, Flow) has no chain and Requested By Role = Internal.
Portal users need an access profile (see VMS access profiles). Guests without one are rejected.
| Action | Client Shift Manager (role Client) | Vendor Portal (role Vendor) |
|---|---|---|
| Request | Request_Extensions__c on the placement's client account (the booking request's account first, else the job or site account) |
Not allowed |
| Approve or decline the Client step | Approve_Requisitions__c on the client account |
|
| Approve or decline the Vendor step | Review_Extensions__c on the supplying vendor account |
|
| Withdraw | Own requests, with Request_Extensions__c on the requesting account |
A review is refused when the extension is no longer Pending or is waiting for another party.
Clients only move the end. A portal request never sets the start: the extension always starts the day after the placement's current End (which already includes approved extensions). The form shows that date locked ("props": { "disableStart": true } on the date range field).
Terms a portal requester may set. New End and comments always. Other terms (job, site, rate group and so on) only when they are listed in the app definition's schedulables.extension.recordFormFields (the field list the request form renders, composite start:end fields included). Without that key only the PO Number may change. Anything else is refused. The master vendor (VMS panel) may set every term.
"extension": {
"recordFormFields": [
{ "field": "b3s__Extension_Start__c" },
{ "field": "b3s__New_End__c" },
{ "field": "b3s__Rate_Group__c" },
{ "field": "b3s__PO_Number__c" },
{ "field": "b3s__Comments__c" }
]
}
Reading extensions. Portal loaders and Id reloads may read Booking Extensions under the read rules: the Client Shift Manager reads the extensions of its accounts' placements (placement job or site account, or the booking request's account, IN :accountIds), the Vendor Portal those of placements it supplied (converted proposal of its invites). Portal sessions never write them through the generic record endpoints: every change goes through the endpoints below.
All three are actions of the b3s.VmsPortalService remoting service and take the standard access arguments (appType, sessionKey). See the calling contract. Dates are YYYY-MM-DD strings. Errors come back as the standard error response with a readable message.
requestExtension
{
"endp": "requestExtension",
"workingPatternId": "a0X...",
"newEnd": "2030-01-31",
"terms": { "b3s__PO_Number__c": "PO-2041" },
"comments": "Keep James two more weeks"
}
{ "success": true, "responseObject": { "extensionId": "a1B...", "status": "Pending", "awaiting": "Vendor" } }
reviewExtension (reviewAction: approve or decline)
{ "endp": "reviewExtension", "extensionId": "a1B...", "reviewAction": "approve", "comments": "Worker available" }
{ "success": true, "responseObject": { "extensionId": "a1B...", "status": "Approved", "awaiting": null } }
withdrawExtension
{ "endp": "withdrawExtension", "extensionId": "a1B...", "comments": "No longer needed" }
{ "success": true, "responseObject": { "extensionId": "a1B...", "status": "Withdrawn", "awaiting": null } }
Master vendor and internal users work in the native Placement Extensions component. They raise a request on the client's behalf (role Master Vendor on a VMS placement, else Internal), approve or decline the agency step (Awaiting Master Vendor or Internal), and withdraw a Pending request they raised. All of these need edit access to the placement.
Client Shift Manager, Extensions tab. Shown when the definition has an extension schedulable and the user holds Request Extensions or Approve Requisitions. Non-VMS portals embed it alone with ?tab=extensions.
extensionPlacement schedulable): the client's placements with a worker that ended in the last 30 days or later. Extend opens the form from extension.recordFormFields with the start shown (locked) as the placement End + 1 and posts requestExtension. Hidden while the placement has a Pending extension.extensions: Pending requests awaiting Client.Vendor Portal, Extensions tab. Shown with an extension schedulable and Review Extensions. It lists the extensions of placements the vendor supplied, with Approve / Decline when awaiting Vendor. There is no request button. Badge extensions: Pending requests awaiting Vendor.
Placement Extensions component (native placementExtensions, master vendor and internal users).
Working_Pattern_Record_Page): Original End, current End and the extension count. Request extension (with edit access, while nothing is Pending) pre-fills Extension Start with the placement End + 1 (editable: internal users may start later and leave a gap), offers the term fields of the design property Request form fields (requestFields, comma-separated Booking Extension API names; default b3s__Job__c,b3s__Site__c,b3s__Rate_Group__c,b3s__PO_Number__c; dates and comments are always shown) and raises the request on the client's behalf. The extensions list has Approve / Decline when awaiting Master Vendor or Internal, Approve for vendor / Decline for vendor (note required) when awaiting Vendor, and Withdraw on the agency's own Pending requests.Extension_Field_Not_Allowed). Remember that defining any active mapping row replaces the built-in list, so the org's rows must also cover the standard fields.vmsAdminHome): the queue of Pending extensions. Design property scope is mine (awaiting Master Vendor or Internal, default) or pending (all Pending), capped at 200.VMS Observation Utility (utility bar). Extensions of VMS placements (the booking request has Is VMS selected, or the extension awaits Master Vendor) show as Extension rows next to the requisitions, grouped by client. A Pending extension awaiting Master Vendor is flagged Approve, counted in the header badge and highlights the utility bar item, so the master vendor sees a client request before it is handed to the sub-vendor. These rows show however old they are; other extensions show while touched in the last 7 days. Open the row to review on the placement.
Requests created with New on the related list wait for nobody. An internal user decides them by setting Status; they appear only under scope pending.
The Version 12 release samples include Client Shift Manager and Vendor Portal configurations with these keys.
| Key | App | Meaning |
|---|---|---|
schedulables.extension |
CSM, VP | objectType b3s__Booking_Extension__c, loaderName extensions; field paths placementFieldPath, workerNameFieldPath, statusFieldPath, awaitingFieldPath, requestedByRoleFieldPath, requestedByContactFieldPath, extensionStartFieldPath, newEndFieldPath, commentsFieldPath; title card fields; CSM accountFieldPaths and recordFormFields (the request form, also the server's term allowlist) |
schedulables.extensionPlacement |
CSM | objectType b3s__Working_Pattern__c, loaderName extensionPlacements, accountFieldPaths, workerNameFieldPath, jobFieldPath (seeds runtime $jobId for showOptionIf), endFieldPath (current End; the form's start shows End + 1), title |
Loader extensions |
CSM | Extensions of placements whose booking request account, else job account, else site account is IN :accountIds (created in the last 365 days) |
Loader extensionPlacements |
CSM | Placements with a worker, End__c in the last 30 days or later, same account split on :accountIds(b3s__Request_Extensions__c) |
Loader extensions |
VP | Placements converted from proposals on the vendor's invites, :accountIds(b3s__Review_Extensions__c) |
Badge extensions |
CSM, VP | Pending, awaiting Client (:accountIds(b3s__Approve_Requisitions__c)) or Vendor |
The CSM loader names must stay extensions / extensionPlacements: the manager registers them by name.
Two WFM settings (b3s__Scheduler__c custom setting) control automatic generation:
| Setting | Effect |
|---|---|
Auto-Generate Placement Shifts (Auto_Generate_Placement_Shifts__c) |
When a VMS proposal on a booking request is approved, the new placement's shifts are generated. Does not apply to extensions. |
Auto-Regenerate Placement Shifts (Auto_Regenerate_Placement_Shifts__c) |
When an extension is approved, shifts are generated in Delta mode from the later of Extension Start and today, to New End. Default off. |
Leave Auto-Regenerate off when your org runs its own logic after approval, for example a record-triggered Flow on b3s__Booking_Extension__c when Status__c changes to Approved, or the standard Generate Shifts flow on the placement.
Generation (Create, Regenerate and Delta) always follows the periods:
The custom metadata type Placement Shift Field (b3s__Placement_Shift_Field__mdt) lists the Shift fields filled from the placement, extension and booking request. For each row, a shift in an extension period takes the extension value, else the placement value, else the booking request value. A shift in the original period takes the placement value, else the booking request value. The same rows decide which extension fields are copied from the latest period when left blank.
| Field | Meaning |
|---|---|
Shift Field (Shift_Field__c) |
API name of the Shift field to fill. |
Placement Field (Placement_Field__c) |
API name on Working Pattern. Blank = not read from the placement. |
Extension Field (Extension_Field__c) |
API name on Booking Extension. Blank = extension periods use the placement value. |
Booking Request Field (Booking_Request_Field__c) |
API name on Booking Request, used when the placement (and extension) value is blank. |
Active (Active__c) |
Untick to stop copying the field. With no active record left, the built-in list applies again. |
No records = built-in fields. The package ships no Placement Shift Field records. While your org has no active record, generation copies the built-in list below (the same fields it always copied). As soon as you create any active record, only your records are used: re-create the built-in rows you still want.
| Built-in | Shift field | Placement | Extension | Booking request |
|---|---|---|---|---|
| Job | b3s__Work_Job__c |
b3s__Job__c |
b3s__Job__c |
b3s__Job__c |
| Site | b3s__Work_Site__c |
b3s__Site__c |
b3s__Site__c |
b3s__Site__c |
| Site location | b3s__Work_Site_Location__c |
b3s__Site_Location__c |
b3s__Site_Location__c |
b3s__Site_Location__c |
| PO number | b3s__PO_Number__c |
b3s__PO_Number__c |
b3s__PO_Number__c |
b3s__PO_Number__c |
| Reason code | b3s__Reason_Code__c |
b3s__Reason_Code__c |
b3s__Reason_Code__c |
b3s__Reason_Code__c |
| Cost center | b3s__Cost_Center__c |
b3s__Cost_Center__c |
b3s__Cost_Center__c |
b3s__Cost_Center__c |
| Rate group | b3s__Rate_Group__c |
b3s__Rate_Group__c |
b3s__Rate_Group__c |
b3s__Rate_Group__c |
| Rate basis | b3s__Rate_Basis__c |
b3s__Rate_Basis__c |
b3s__Rate_Basis__c |
b3s__Rate_Basis__c |
Leave out Job or Site only deliberately: the shift account falls back to the period job's account, and the shift timezone to the period site.
To copy one of your own fields, add the same field to Shift, Working Pattern and (optionally) Booking Extension and Booking Request, re-create the built-in rows you need, then add a row, for example:
| Field | Value |
|---|---|
| Label | Shift Notes |
| Shift Field | Shift_Notes__c |
| Placement Field | Shift_Notes__c |
| Extension Field | Shift_Notes__c |
| Booking Request Field | Shift_Notes__c |
| Active | checked |
Rules for rows:
b3s__ prefix.Last_Generation_Log__c). Creating an extension also fails while a row is invalid.These fields are always set by the product, not by the mapping: contact, placement, scheduled times, account, VMS flag, Status (Confirmed for VMS placements), Supplier Account, Supplier Account Tier, and the Working Pattern Day's Rate Basis when no mapped Rate Basis is set.
Blank terms on a new extension are copied from the latest period without re-checking them. Rate Basis and Reason Code values you type are validated as on shifts. An extension created while an older placement value (for example a deactivated reason code) is in place therefore still saves.
Page layouts are not upgraded in subscriber orgs. After upgrading, add the Request Extensions and Review Extensions checkboxes to your User Profile layout, the Booking Extension approval fields to its layout, the Booking Extensions related list, the Extend Placement action and the Original End, Extensions and Last Extension End fields to your Working Pattern layout, and grant the new objects and fields in your own permission sets if you do not use WFM Admin.
The WFM Admin permission set grants Booking Extension create, read, edit and delete, edit access to its term fields, read access to Previous End, Booking Request, Original End, Extensions, Last Extension End and the approval fields (Awaiting, Approval Chain, Requested By, Reviewed By, Response Comments, all set by the server), and edit access to the two Account extension settings and the two User Profile checkboxes. Booking Extension sharing is controlled by the placement.
| Message | Cause |
|---|---|
| The extension must start after the placement's current End | Extension Start is on or before the placement End. |
| This placement already has a Pending extension | Decide the open request first. |
| The placement End has changed since this extension was requested | Someone edited the placement End after the request. Withdraw it and create a new one. |
| The extension's job must belong to the placement's client account | Pick a job of the same client. |
| This extension is Approved and can no longer be changed | Decisions are final. Create a new extension instead, or ask a user with Edit_Decided_Extensions to correct it. |
| This extension is waiting for Vendor, not for you | Another party confirms first. Awaiting shows who. |
| Your profile does not allow requesting extensions for this placement | The user's profile lacks Request Extensions on the client account, or the vendor did not supply this placement. |
| The field ... cannot be set on an extension request | The term is not in the definition's schedulables.extension.recordFormFields, or it is set by the server. |
| No shifts after approval | Auto-Regenerate Placement Shifts is off, or the extension ended before today. Run Generate Shifts on the placement. |
| Last Generation Log starts with "Placement Shift Field ..." | A mapping row is invalid. Fix or deactivate it and run Generate Shifts again. |